Our Services
Everything we do on a site, in the order it happens.
Four phases. Build it, prove it, tune it, and restore it when something changes. Every line below is work our own crews perform , we do not resell it.
Build
Build, construction and deployment
Civil works & foundations
Compound groundworks, footings, access tracks and fencing.
Power, grounding & cabinets
DC plant, rectifiers, batteries, earthing and cabinet installation.
Tower erection & modification
New steel, extensions, reinforcement and mount replacement.
Fibre & backhaul
Fibre pulls, terminations, splicing and microwave alignment.
Antenna & line installation
Sectors, mounts, feeders, jumpers and hybrid cable, dressed and labelled.
Small cell & DAS
Street furniture, rooftop and in-building deployments.
Verify
Verify, commissioning and acceptance
Line sweep , VSWR & DTF
Return loss and distance-to-fault on every run, traces included.
PIM testing
Passive intermodulation to the acceptance threshold, with the fault located, not just flagged.
Site audits & RFDS validation
As-built against the design, discrepancies photographed and listed.
Structural analysis & mount mapping
Capacity, loading and mount condition before anything else goes on the steel.
Integration & commissioning
Bring-up, alarms cleared, carriers on air and verified.
Closeout packages
The full evidence set, in your template, first time.
Optimise
Optimise, performance and assurance
Site optimisation
Azimuth, tilt and parameter tuning against measured performance.
Performance monitoring
Ongoing watch on the numbers that predict a fault before it becomes a ticket.
Drive testing & benchmarking
Cluster and route testing, before and after a change.
Antenna alignment & audit
Verified bearings and tilts, corrected on the same visit.
Restore
Restore , diagnosis and fault resolution.
Fault diagnosis
Remote data first, scoped dispatch second. The diagnosis decides the visit, not the other way round.
Interference hunting
External sources located and identified, with bearings and evidence.
Spectrum clearance
The band proven clean before the site goes on air, and after.
Emergency restoration
Site down, crew moving, [X]-hour response in covered regions.
Repeat-ticket investigation
Sites that keep reopening. We find the reason the last three fixes did not hold.
Dispatch
Scope
Prove
Diagnose
Tell us what is wrong. We will tell you what it will take.
Send the site ID, affected band, and the issue. Within one working day, an engineer responds with the recommended scope, required test equipment, and field approach. No sales sequence. Just a plan to get the site fixed.